GSI offers webinar on geosynthetics in erosion control

September 6th, 2017

The Geosynthetic Institute (GSI) will offer a webinar on “Geosynthetics in Erosion Control,” on September 13, 2017, from 11:30 a.m. to 1 p.m. EDT. The estimated cost of landslides in the United States is $2 to 5 billion; worldwide, it may approach $10 billion. The many landslides triggered by surface erosion is a major contributor […]

Read More

History of geosynthetics use on national forest roads

June 1st, 2017

Introduction The objectives of this article are to document the long history of geosynthetic materials used in the U.S. Department of Agriculture (USDA) Forest Service and other rural roads, to document the many creative and useful ways geosynthetics have been used, and to promote the cost-effective uses of geosynthetics in road projects today, particularly on […]

Read More

Geosynthetics Materials Association News

June 1st, 2017

GMA honors Dr. Robert M. Koerner and Dr. George Koerner On March 14 in Orlando, Fla., the Geosynthetic Materials Association (GMA) hosted the inaugural Robert M. Koerner Award and Lecture Series. Established by GMA in 2016, the award and lecture series is given to an individual who has had a measurable impact on the geosynthetics […]

Read More

Environmental applications of geosynthetics in pipeline installations

June 1st, 2016

Geo + Pipeline 101 Geosynthetics often play an important role on the environmental side of pipeline installations. During construction, actions must be taken to protect water quality, stabilize soil, and prevent soil erosion. Pipeline right-of-ways traverse many different types of landscapes, passing through sensitive resource areas such as streams and wetlands. Geosynthetics are used in […]

Read More

Renovating the Zhongsha Bridge

February 1st, 2016

Award of Excellence Ace Geosynthetics Introduction The object of this renovation project is the Zhongsha Bridge located on the Zhuoshui River in west-central Taiwan. The 2,345m-long bridge spans the Zhuoshui on the border between Changhua and Yunlin counties. The bridge was built in 1978 with prestressed hollow core piles and prestressed beams. It is part […]

Read More