Archives

Environmental applications of geosynthetics in pipeline installations

June 1st, 2016

Geo + Pipeline 101 Geosynthetics often play an important role on the environmental side of pipeline installations. During construction, actions must be taken to protect water quality, stabilize soil, and prevent soil erosion. Pipeline right-of-ways traverse many different types of landscapes, passing through sensitive resource areas such as streams and wetlands. Geosynthetics are used in […]

Read More

GMA’s 2016 government relations program is in full swing

June 1st, 2016

March 2016 was a great month for GMA to ramp up its 2016 federal and state lobbying efforts. GMA members and I had the opportunity to meet with three federal agencies in Washington, D.C. These meetings allowed GMA to educate government officials about the benefits of geosynthetic materials and at the same time encouraging federal […]

Read More

Part 3: Field evaluation of the performance of unpaved roads incorporating geosynthetics—Implementation

June 1st, 2016

Introduction The mechanisms that govern unpaved road performance are complex, and accurate field evaluation of the performance of unpaved roads incorporating geosynthetics is not easy because it involves many influence factors. Interpretation of test data can be correct only if there is a good understanding of the mechanisms (which was the purpose of the Part […]

Read More

Three of the most difficult questions

June 1st, 2016

From the GMA Techline Q-and-A 1. Mold inside drainage layer? Q: Recently there has been a greater demand for sustainable projects in Southern California and I was glad to see published in Geosynthetics magazine “Geosynthetics: The science that makes green roofs work” (June/July 2014, Vol. 32, No. 3). I am curious if there are any […]

Read More

Reinforced soil slope design and construction

June 1st, 2016

Harold Court East Regional Service Center in Austin, Texas Introduction The Harold Court East Regional Service Center in Austin, Texas, is a city-owned multi-purpose facility used primarily for material storage. The erosion control and other issues at this site included: periodic movement of the embankments on the western and southern boundaries of this property. the […]

Read More

Teaching the kids the real world of machining and manufacturing up close

June 1st, 2016

We thought it would be a good idea to invite some students from El Dorado High School’s metal shop here in Placerville to come to our facility to have an opportunity to see the real world of metal machining and manufacturing. The great thing about a field trip through our facility in Placerville is that […]

Read More

Lining of soil embankment?

June 1st, 2016

Questions and answers from the GMA Techline I have a question concerning lining systems in embankment dams and want to ask for your advice (from your experience only, no need for any calculations). There is a wastewater reservoir built of clay, with a single HDPE geomembrane on top of the clay (i.e., a kind of […]

Read More

‘Largest green roof in the world’ proposed for Silicon Valley project

June 1st, 2016

Last year, Uruguayan architect Rafael Viñoly unveiled plans to convert an ageing shopping center in California’s Silicon Valley into a vast development featuring the world’s largest green roof. Viñoly, the architect behind London’s controversial Walkie Talkie building and the skinny 432 Park Avenue skyscraper in New York, will work with OLIN Landscape Architects to redevelop […]

Read More