Archives
-
2024
-
2023
-
2022
-
2021
-
2020
-
2019
-
2018
-
2017
-
2016
-
2015
-
2014
-
2013
-
2012
-
2011
-
2010
-
2009
-
2008
-
2007
-
2006
-
2001
-
2000
-
1999
-
1997
-
1970
Performance evaluation of a multi-span GRS–IBS
April 1st, 2019
The I-70 multi-span bridges (Figure 1) over Smith Road in Aurora, Colo., included design methodology changes that were classified as “experimental features,” and, thus, additional project funds were included for evaluation. In order to understand the geostructural performance of the multi-span geosynthetic reinforced soil–integrated bridge system (GRS–IBS), the abutment was instrumented with a vertical chain […]