Archives

CCR landfill final cover test pad—Part 2

October 1st, 2020

By Nina J. Balsamo, John Massey-Norton, John R. Klamut, Terry Queen,Charles F. Straley and Mark R. Lehner FIGURE 1 Test pass of loaded 45-ton (40.8-tonne) truck over 3 feet (0.9 m) of cover soil on bench An integrated drainage system (IDS) geomembrane, which provides both a low-permeability membrane and drainage space above the geomembrane, is […]

Read More

CCR landfill final cover test pad—Part 1

August 1st, 2020

By Nina J. Balsamo, John Massey-Norton, John R. Klamut, Terry Queen,Charles F. Straley and Mark R. Lehner An integrated drainage system (IDS) geomembrane, which provides both a low-permeability membrane and drainage space above the geomembrane, is being used in the final cover at a coal combustion residuals (CCR) landfill in West Virginia. Part 1 of […]

Read More