Archives
-
2024
-
2023
-
2022
-
2021
-
2020
-
2019
-
2018
-
2017
-
2016
-
2015
-
2014
-
2013
-
2012
-
2011
-
2010
-
2009
-
2008
-
2007
-
2006
-
2001
-
2000
-
1999
-
1997
-
1970
FGI webinar – Geosynthetics Case Studies – Aug. 22
July 30th, 2024
The Fabricated Geomembrane Institute is presenting the webinar - Geosynthetics Case Studies - on August 22, 2024 at noon CDT. Pre-recorded times are: August 23, 2024 at Noon AEST (Pre-recorded - Australia) Potts Hill Reservoir Project August 23, 2024 at Noon CAT (Pre-recorded - South Africa) August 23, 2024 at 5 pm JST (Pre-recorded - […]
Fabtech Australia using specialist geomembrane materials for Sydney Water installation
July 6th, 2022
Fabtech Australia, an Australian geosynthetic containment specialist, was awarded contracts to supply, design and install a new liner and cover at Sydney Water’s Potts Hill Reservoirs. Specialist geomembrane materials have been selected for the project following extensive testing to prove their capability for the project. Material production is underway and on-site work started in April […]
Fabtech Australia replaces huge anaerobic lagoon geosynthetic cover
April 7th, 2021
Goulburn Valley Water in Australia has undertaken upgrade work to the 266-million-gallon (50-megaliter) High Rate Anaerobic Lagoon (HRAL) located at their Daldy Road, Shepparton, Victoria, waste management facility. The lagoon has an area of 538,196 square feet (50,000 m2). The upgrade work includes removing the existing cover, which has reached the end of its service […]