Found 939 results.

U.S. Bank Stadium geosynthetic reinforced stress relief wall

February 1, 2020

…on the same site. FIGURE 1 U.S. Bank Stadium. Photograph by Tiffany Daniels/Mortenson Construction, Courtesy of SMG, U.S. Bank Stadium and Meet Minneapolis The stadium architect provided a concept-level drawing…

Read More

Erosion control using concrete-enhanced synthetic turf

February 1, 2020

…had significant erosion due to boat wakes. The canal bank was reconstructed out of the highly erodible, sandy site soils, which were graded to a 1.5H:1V slope. The CEST was…

Read More

Reinforcing dunes and bluffs with geosynthetics

October 1, 2019

…(SBPF) and project updates are regularly posted on SBPF’s website, www.sconsetbeach.org. Observations from the Montauk site are being used to calibrate erosion modeling of a reinforced dune/beach cross section using…

Read More

Repairing an oil well platform with a geogrid reinforced soil slope

October 1, 2019

…By Jeff A. Segar  The Mormon Butte site is in the Little Missouri National Grassland in the Badlands region of western North Dakota (Figure 1). Constructed in 1985…

Read More

Nature area drainage control with GCCM

October 1, 2019

…Shotcrete/poured concrete  Shotcrete or poured concrete was reviewed, but access to the site is limited and concrete trucks could not enter the trail. The trail has a single access point…

Read More

Lessons learned in alternative coal ash pond closure design and construction

October 1, 2019

…CCR unit, CCR grading, construction quality assurance (CQA) services and construction management activities. Water management is variable between sites and between ash ponds on the same site (Figure 3). Retaining…

Read More

Recovery of rare earth elements from acid mine drainage using geotextile tubes

October 1, 2019

…the I-99 AMD project, the DEP designed its first large-scale project for the Omega mining complex south of Morgantown. The site consisted of three abandoned mines generating 35 to 71…

Read More

Remediation case study of uranium ore residues settling basin

September 30, 2019

…2006, the regional Authority of Water Management declared Pond 4 as a contaminated site to be remediated. Generally, the management of tailings ponds consists of three main steps: solid-liquid separation,…

Read More

IFAI opens registration for Geosynthetics Conference 2020: CASE STUDIES

September 12, 2019

…to look forward to on the full schedule, and we can’t wait to see you in Charleston. To learn more about the conference, visit www.geosyntheticsconference.com. To register, visit www.geosyntheticsconference.com/register….

Read More

Geosynthetics Conference watch: Geosynthetics Conference 2020: CASE STUDIES

August 1, 2019

…John M. Allen, P.E., CETCO Environmental Products Technical Program Project Manager Megan Firl, Industrial Fabrics Association International Secretary General Barbara J. Connett, Industrial Fabrics Association International Visit www.GeosyntheticsConference.com to learn…

Read More