Found 939 results.

The Wave project wins BCI Award for ABG

November 16, 2020

…Magazine. The lake’s design includes ABG’s Pozidrain geocomposite drainage layer to relieve groundwater uplift pressure at the site. The location is nearby to the Severn Estuary and its floodplains, which meant extensive…

Read More

ASTM International cancels all in-person standards meetings through February 2021

November 2, 2020

…View the status of your committee’s next meeting by visiting www.astm.org/meetings. For additional resources–including PDF guides for members participating virtually–please visit www.astm.org/updates/committees.html. Earlier this year, ASTM International also announced they…

Read More

Ground improvements using geofoam: A case history

October 14, 2020

…By Javaid M. Alvi, Ph.D., and Jahangir J. Kabir, Ph.D., P.E The project site is a triangular-shaped property located at the intersection of Raleigh Avenue and West Liberty…

Read More

Full schedule now available for Geosynthetics Conference 2021

October 1, 2020

…attend the sessions that have caught your eye and mapping out which booths you will visit. Visit www.geosyntheticsconference.com to view the full program and peruse the list of exhibitors.  …

Read More

Mechanically stabilized earth wall with simulated tablets as facade

October 1, 2020

…building the embankment using a reinforcement system with galvanized steel meshes and finished with concrete tablets manufactured on-site. The contractor reviewed various retaining wall systems. The systems had to comply…

Read More

The GMA Techline

October 1, 2020

…US EPA Technical Guidance Document, EPA/600/R-93/182, Washington, DC, Office of R & D, Cooperative Agreement No. CR-815546-01-0. Both documents state that trial welds are tested on-site two times a day:…

Read More

A geosynthetic wrap-face vegetated wall system

October 1, 2020

…the embankment for primary soil reinforcement. FIGURE 2 Partially completed GWFV wall along west embankment approach Site conditions To accommodate the new bridge, realignment of the road would require a…

Read More

CCR landfill final cover test pad—Part 2

October 1, 2020

…More than 16 acres (6.5 ha) of the final cover system have been constructed at this site to date using these materials and procedures. No apparent issues have occurred during…

Read More

Leister Technologies LLC offers free geosynthetics welding webinar

September 24, 2020

…to learn about data capturing and sharing, giving operators and managers the confidence required to produce flawlessly welded geomembranes on a consistent basis, regardless of the jobsite and/or welding conditions….

Read More

GSI to host webinar on lifetime predictions of geosynthetics

September 17, 2020

…geosynthetics then progressed to using site-specific radiation to obtain an equivalent field life. Phoenix, Ariz., conditions are illustrated although the procedure is applicable worldwide. Half-life predictions for the geotextiles vary…

Read More