Geogrid embankment reinforcement at South African oil tank farm

April 6, 2022  |  Case Studies

Naue GmbH & Co provides geogrid embankment reinforcement for the new Oil Tanking MOGS Saldanha crude oil storage facility in South Africa.
Geocells for Suriname mine haul roads

March 28, 2022  |  Case Studies, News

Presto Geosystems deploys the GEOWEB Cellular Confinement System geocells for Suriname gold mine haul roads.
Engineered earth with greywater systems

March 10, 2022  |  Case Studies

Propex incorporates a system of engineered earth with greywater irrigation on slope at residential site in Malibu, Calif.
Free Geosynthetics Conference archive launches

February 25, 2022  |  ATA Events, Case Studies

The conference’s organizers have made available 1,500 white papers and dozens of videos in the online, free Geosynthetics Conference archive.
Geosynthetics for Alaska landfill closure

February 23, 2022  |  Case Studies

Solmax provides a combination of geosynthetics for Alaska landfill closure project with multiple challenges.
Flood reconstruction with geosynthetics

February 16, 2022  |  Case Studies

The use of geogrid-reinforced earth allows reconstruction of a flood-destroyed German bridge in record time.
‘Geosynthetics Super Bowl’

February 11, 2022  |  Case Studies

The Reinforced Earth Co.’s MSE retaining wall at SoFi Stadium in Inglewood, Calif., plays a hidden but important role in the “geosynthetics Super Bowl.”
Landfill geosynthetics for abandoned Italian dump

February 7, 2022  |  Case Studies

Landfill geosynthetics transform the abandoned dump near Cava De’Tirreni, Italy, into a green oasis in the heart of the Metelliana Valley.
Geocomposite solution for container park in Mauritius

February 3, 2022  |  Case Studies

TenCate Geosynthetics EMEA stabilized the platform for the Mauritius Container Terminal (MCT) with the geocomposite solution, TenCate Rock PEC 55-55.
Protecting groundwater with geomembranes in Swedish highway expansion

January 18, 2022  |  Case Studies, News

The E4 highway in Sweden meanders 346 miles (557 km) between Helsingborg and Stockholm. It is one of the country’s most important traffic and transport routes. Trafikverket (Swedish Transport Administration) sought to upgrade an 18.6-mile (30-km) stretch of this highway at Ljungby, 267 miles (429 …