Bentonite Cutoff Anchorage
February 1, 2024 | Q&A: GMA Techline
Q: I have a bentonite cutoff wall containing a positive pressure inside and an overfill situation where the waste being capped will have perched water in the waste mass above the perimeter elevation. Do you have a recommendation for the perimeter connection detail for such a situation?