This page was printed from https://geosyntheticsmagazine.com

A geosynthetic wrap-face vegetated wall system

Case Studies, Features | October 1, 2020 | By:

For highway embankment construction  By Stanley M. Miller and Drew Loizeaux A recent creek enhancement project to facilitate the passage of bull trout in Pend Oreille County of northeastern Washington state required removal of a 6-foot (1.8-m) diameter concrete culvert (Figure 1), realignment of a well-traveled county road and a new 58-foot (17.7-m) span bridge. […]

 

ATA members may login to access this members only content. Non-Members please click join now to review our digital content member option.

 

Share this Story