Found 722 results.

IAGI’s Approved Installation Contractor information online

October 1, 2006

…an engineer-specified designation, AIC, can now find complete program details and submittal form online at www.iagi.org. Developed from dialogs with member installers, member suppliers, outside experts in the containment field,…

Read More

New release of Geomagic Studio

October 1, 2006

…and versatility with user-defined patch layouts. The software automatically creates accurate models from any physical part, making it ideal for emerging applications such as mass production of customized devices, build-to-order…

Read More

San Diego Bay gets an underwater facelift

October 1, 2006

…installation of an appropriate capping system to isolate sediments containing residual shipyard waste, has cost approximately $16 million. To date, a total of more than $72 million has been spent…

Read More

Geotube dewatering containers help in cleanup of the Fox River

August 1, 2006

…different sections of the river and bay would require removal of 7.25 million yds.3 of contaminated sediment at an estimated total cost of more than $400 million. PCB contamination PCBs…

Read More

Cuckoo for coconet

August 1, 2006

…world’s No. 2 coconut producer, second only to Indonesia, the Philippines accounts for nearly 25% of the world’s total coconut production. Historically, farmers viewed discarded coconut husks as waste and…

Read More

Construction of polyethylene plant in Qatar

August 1, 2006

…to Qatofin sources. Qatofin is a joint venture with Qapco (63%), Total Petrochemicals (36%), and QP (1%). Qatar is located midway along the western coast of the Arabian Gulf….

Read More

Geofoam provides lightweight fill for York Bridge in Washington

August 1, 2006

…Associates—Cultural resources General contractor: Mowat Construction Co. Artist: Cliff Garten Total project construction cost: $9.5 million Project start (construction): June 2005 Project completion: September 2006 Key materials/suppliers: Geofoam—ACH Foam TechnologiesStructural

Read More

Selecting reinforced fill soil for MSE retaining walls

June 1, 2006

…and Transportation Officials Automated robotic total station technology: Robotic Total Stations (RTSs) were first developed in the early 1990s and were soon incorporated into construction efficiencies. RTSs with automatic searching…

Read More

GCLs used for airport runways in France, containment at gold mine in Saudi Arabia

June 1, 2006

…of separation nonwoven geotextile were installed within two weeks. The capital expenditure for the total extension work was €13 million ($15.78 million U.S.) and was borne by the Toulouse Chamber…

Read More

Biodegradable staple system introduced

June 1, 2006

…holding and tensile strength. A manual applicator system is available now; a pneumatic hand-held and automated applicator is planned for future release. For more information: 888 352 9582; sales@AmericanExcelsior.com….

Read More