Found 2366 results.

Geosynthetics in the Greater Grand Forks Greenway

January 1, 1970

…and designed for both soil stabilization and ease of seeding. Applied on soil, it looks a bit like a tangled fishing net. For this Red River project, after the riprap…

Read More

The benefits of GRS bridges

January 1, 1970

…By Jessica Bies Although GRS bridge technology is not suitable for every bridge building scenario, it can be a great option for replacing simple overpasses where severe flooding…

Read More

Go with the flow

January 1, 1970

…Keswick Reservoir and enters the upper Sacramento River near Redding. Still confused? Check out our online interactive map to get a look at the project site and the surrounding area:…

Read More

Central Valley Project

January 1, 1970

…government’s excessive utilization of hydroelectric and irrigation programs, today’s developments in dam design and management plus innovations such geosynthetic materials can mitigate these effects. Jessica Bies, Geosynthetics editorial intern…

Read More

Crew faces many challenges in completing Newry-to-Dundalk roadway

January 1, 1970

…one overbridge already opened to traffic. Traffic management was also a major design and construction consideration because it was essential to keep traffic on the existing A1/N1 moving and live…

Read More

Measuring puncture resistance

January 1, 1970

…effects of slower pressurization rates. For commercial labs that perform the test go to: www.geosynthetic-institute.org/gai/method.htm. You will find a list of five of them. Bob Koerner | GMA Techline…

Read More