Geotube questions
April 1, 2006
…construction equipment used, you should contact the author of the paper directly. His e-mail address is given at the end of the article: www.axisingenieria.com. Bob Koerner | GMA Techline…
Found 1165 results.
April 1, 2006
…construction equipment used, you should contact the author of the paper directly. His e-mail address is given at the end of the article: www.axisingenieria.com. Bob Koerner | GMA Techline…
April 1, 2006
…For more information on GreenSpec or other resources published by BuildingGreen, Inc., visit: www.GreenSpec.com or call 800 861 0954; outside the U.S. and Canada, call +1 802 257 7300….
April 1, 2006
…announced a realignment of its business. The new organization will consist of four operating divisions: Environmental Stormwater Solutions, Bridge Solutions, Earth Stabilization Solutions, and Drainage Solutions, as well as a…
July 27, 2000
…information regarding geosynthetics and provides a forum for consistent and accurate information to increase the acceptance and to promote the correct use of geosynthetics. Visit www.gmanow.com for more information….
December 1, 1997
…information regarding geosynthetics and provides a forum for consistent and accurate information to increase the acceptance and to promote the correct use of geosynthetics. Visit www.gmanow.com for more information….
January 1, 1970
…at the front wall of the pullout box to avoid front wall effects, as recommended by researchers (Farrag et al., 1993; Moraci and Montanelli, 2000). The pullout apparatus is capable…
January 1, 1970
…effects of slower pressurization rates. For commercial labs that perform the test go to: www.geosynthetic-institute.org/gai/method.htm. You will find a list of five of them. Bob Koerner | GMA Techline…
January 1, 1970
…drainage from the SUT area into the Little Kamiskotia River south of the site resulted in severe effects on the biota of that river, with its waters at a pH…
January 1, 1970
…Montanelli, 2000; Moraci and Recalcati, 2006), and helps to ensure a good reproducibility of results and to minimize the scale effects. All pullout tests described herein have been performed at…
January 1, 1970
…By Ron Bygness The A1/N1 Newry-to-Dundalk link road is a cross-border, design-and-build route that runs between the Cloghoge roundabout, south of Newry, Northern Ireland, and the Ballymascanlon interchange,…