Figure 1 Aerial showing the multi-stages of construction of the geocomposite, liner and floating cover This article is a review of the Upper Chiquita Reservoir project originally constructed in 2011 and today remains one of the largest and most challenging potable-water liner and geomembrane floating cover projects installed in the United States. The reservoir liner […]
Upper Chiquita Reservoir update
Features | October 20, 2024 | By: Brian Fraser
You might also like...
Bringing new and existing geosynthetic products to market
Ballast preservation system still providing protection against ballast fouling
The role of a biaxial geogrid in subgrade stabilization
Soil nail and shotcrete reinforcement for new roadway embankment