Geotextiles in unpaved roads: A 35-year case history
January 1, 1970
…(15cm) of gravel base (40% of design) was actually used, according to Hutchins in 2007. The tests were run in 2 stages: a dry run, in which the loaded vehicle…
Found 404 results.
January 1, 1970
…(15cm) of gravel base (40% of design) was actually used, according to Hutchins in 2007. The tests were run in 2 stages: a dry run, in which the loaded vehicle…
January 1, 1970
…each category. The award description: “The Houghton-Berry property is located atop a steep bluff in Rubicon Bay where the shoreline [had sustained] highly eroded banks and severe undercutting. The design…
January 1, 1970
…freight traffic 30ft high, removing dangerous trains from the streets of Manhattan’s largest industrial district. No trains have run on the High Line since 1980. Friends of the High Line,…
January 1, 1970
…allowing for substantial reduction of long-term strength of the reinforcing geosynthetic. If accepted, a new mode of failure that has not yet been seen will likely be realized: rupture of…