Archives
-
2024
-
2023
-
2022
-
2021
-
2020
-
2019
-
2018
-
2017
-
2016
-
2015
-
2014
-
2013
-
2012
-
2011
-
2010
-
2009
-
2008
-
2007
-
2006
-
2001
-
2000
-
1999
-
1997
-
1970
Tiltex adds water infiltration barrier and ground surface erosion control protection to reinforced earth wall
March 9th, 2023
The Tiltex installation team recently completed a major water infiltration barrier and erosion control ROM Wall Crusher project at Ironbridge Mine in Pilbara, Western Australia. The team installed Tiltex 12B anti-cracking 11,000 psi compressive strength geosynthetic cementitious composite mats (GCCM) over 164-foot-long steep batters at 1V:1.6H, secured with its soil anchor grid system designed to endure 164ft/sec winds. Ironbridge Mine in Pilbara, Western Austrlia. […]
Tiltex completes water infiltration barrier and erosion control protection to reinforced earth wall
September 12th, 2022
Tiltex Australia has completed a major water infiltration barrier and erosion control installation to the Run of Mine (ROM) Wall Crusher A project at the Iron Bridge mine in Pilbara, Western Australia. The team installed a Tiltex 12B Anti-Cracking 80 MPa Compressive Strength Geosynthetic Cementitious Composite Mat (GCCM) over 50+-meter-long steep batters at 1V:1.6H, secured with its soil anchor grid system designed to endure 50m/sec winds. Tiltex 12B […]