Archives

Tiltex adds water infiltration barrier and ground surface erosion control protection to reinforced earth wall

March 9th, 2023

The Tiltex installation team recently completed a major water infiltration barrier and erosion control ROM Wall Crusher project at Ironbridge Mine in Pilbara, Western Australia. The team installed Tiltex 12B anti-cracking 11,000 psi compressive strength geosynthetic cementitious composite mats (GCCM) over 164-foot-long steep batters at 1V:1.6H, secured with its soil anchor grid system designed to endure 164ft/sec winds. Ironbridge Mine in Pilbara, Western Austrlia. […]

Read More

Tiltex completes water infiltration barrier and erosion control protection to reinforced earth wall

September 12th, 2022

Tiltex Australia has completed a major water infiltration barrier and erosion control installation to the Run of Mine (ROM) Wall Crusher A project at the Iron Bridge mine in Pilbara, Western Australia. The team installed a Tiltex 12B Anti-Cracking 80 MPa Compressive Strength Geosynthetic Cementitious Composite Mat (GCCM) over 50+-meter-long steep batters at 1V:1.6H, secured with its soil anchor grid system designed to endure 50m/sec winds. Tiltex 12B […]

Read More