Archives

Tiltex adds water infiltration barrier and ground surface erosion control protection to reinforced earth wall

March 9th, 2023

The Tiltex installation team recently completed a major water infiltration barrier and erosion control ROM Wall Crusher project at Ironbridge Mine in Pilbara, Western Australia. The team installed Tiltex 12B anti-cracking 11,000 psi compressive strength geosynthetic cementitious composite mats (GCCM) over 164-foot-long steep batters at 1V:1.6H, secured with its soil anchor grid system designed to endure 164ft/sec winds. Ironbridge Mine in Pilbara, Western Austrlia. […]

Read More

Hawaii geosynthetic highway drainage application

October 26th, 2021

Photograph courtesy of Tiltex Tiltex 7B geosynthetic cementitious composite mat (GCCM) was recently specified by the Hawaiian Department of Transport for a highway roadside drainage upgrade project. Due to its ease of application to existing road infrastructure and hot asphaltic road surfacing to Tiltex 7B, fast application time and 11,603-psi (80-MPa) compressive strength, Tiltex 7B […]

Read More

Preliminary injunction prohibiting Eurobent from manufacturing Tiltex in Poland upheld for third time

August 3rd, 2021

A fresh attempt by Eurobent Sp.z.o.o. to set aside the preliminary injunction that prohibits, within Poland, the manufacture, offering, importing and putting Tiltex on the market has failed. The Regional Court in Legnica, Poland, on June 8, 2021, dismissed Eurobent’s motion for setting aside the preliminary injunction order. This is the third time Eurobent has […]

Read More