Archives
-
2024
-
2023
-
2022
-
2021
-
2020
-
2019
-
2018
-
2017
-
2016
-
2015
-
2014
-
2013
-
2012
-
2011
-
2010
-
2009
-
2008
-
2007
-
2006
-
2001
-
2000
-
1999
-
1997
-
1970
U.S. Bank Stadium geosynthetic reinforced stress relief wall
February 1st, 2020
Design, construction and fire damage mitigation By Nathan M. Lichty, Stephan M. Gale and Timothy P. Bendell Demolition of the Hubert H. Humphrey Metrodome stadium in Minneapolis, Minn., occurred in 2014 and subsequent construction of U.S. Bank Stadium (Figure 1), the home of the Minnesota Vikings and host of the 2018 Super Bowl, occurred between […]
Repairing an oil well platform with a geogrid reinforced soil slope
October 1st, 2019
By Jeff A. Segar The Mormon Butte site is in the Little Missouri National Grassland in the Badlands region of western North Dakota (Figure 1). Constructed in 1985 and leased through the U.S. Forest Service, the pad elevation was created by cutting into the side of the butte and depositing the spoils at a 1H:1V […]
Yeager Airport: Deconstruction and reconstruction of the side of a mountain
April 1st, 2019
Yeager Airport is located on top of a series of leveled mountains in Charleston, W.Va. Completion of the original airport construction in the 1940s required 9 million cubic yards (6.9 million m3) of soil and rock earthwork (Keller 2017). In 2005, due to Federal Aviation Administration (FAA) safety requirements, it was necessary to construct a […]