Archives
-
2024
-
2023
-
2022
-
2021
-
2020
-
2019
-
2018
-
2017
-
2016
-
2015
-
2014
-
2013
-
2012
-
2011
-
2010
-
2009
-
2008
-
2007
-
2006
-
2001
-
2000
-
1999
-
1997
-
1970
CCR landfill final cover test pad—Part 2
October 1st, 2020
By Nina J. Balsamo, John Massey-Norton, John R. Klamut, Terry Queen,Charles F. Straley and Mark R. Lehner FIGURE 1 Test pass of loaded 45-ton (40.8-tonne) truck over 3 feet (0.9 m) of cover soil on bench An integrated drainage system (IDS) geomembrane, which provides both a low-permeability membrane and drainage space above the geomembrane, is […]
CCR landfill final cover test pad—Part 1
August 1st, 2020
By Nina J. Balsamo, John Massey-Norton, John R. Klamut, Terry Queen,Charles F. Straley and Mark R. Lehner An integrated drainage system (IDS) geomembrane, which provides both a low-permeability membrane and drainage space above the geomembrane, is being used in the final cover at a coal combustion residuals (CCR) landfill in West Virginia. Part 1 of […]
The GMA Techline
April 1st, 2020
Moderated by George R. Koerner and Y. “Grace” Hsuan Welding Rod Q: This question is in regard to the welding rod intended for welding of geomembranes (both high-density polyethylene [HDPE] and linear low-density polyethylene [LLDPE]). Are there any GRI GM13- or GM17-based requirements for welding rods or are there any white papers or specifications? I […]