Archives

Bentonite Cutoff Anchorage

February 1st, 2024

Q: I have a bentonite cutoff wall containing a positive pressure inside and an overfill situation where the waste being capped will have perched water in the waste mass above the perimeter elevation. Do you have a recommendation for the perimeter connection detail for such a situation? A: We generally use an anchor trench beyond […]

Read More