Contech introduces bell and spigot pipe solution
January 9th, 2024
Contech® Engineered Solutions, a Quikrete company, announces the launch of QuikJoint® with UHP (ultra-high performance) technology, an innovative joint solution for the DuroMaxx® SRPE (steel reinforced polyethylene) piping system that allows for easy in-ground pressure testing to confirm proper installation and performance. QuikJoint is manufactured to meet the requirements of ASTM D-3212, providing ease of […]
Multi-linear drainage geocomposites for railways
June 1st, 2022
FIGURE 1 Multi-linear drainage geocomposite under railway embankment In civil engineering, drainage systems are traditionally made with granular material layers and perforated collector pipes. The use of drainage geocomposites became more common 30 years ago with the development of products that met the specific requirements of each application. Moreover, the geocomposite is cheaper than the […]
Landfill trenches with geocomposites
June 1st, 2022
Q: I am wondering if you know of or can point me in the right direction in regard to determining viability of leachate disposal via spraying back onto the active face of a landfill. I have a landfill that has a few issues, and while, from a practical sense, we have had some success with […]
Layfield introduces HydraNet geonets/geocomposites
April 7th, 2022
Layfield introduces HydraNet geonets/composites, described as cost-effective and environmentally conscious alternatives to aggregate drains. Layfield Group Ltd. has launched HydraNet, a premium line of geonets and geocomposites. HydraNet is constructed from either two strands (biplanar) or three strands (triplanar) of high-density polyethylene (HDPE) extruded into a net-like sheet. Geonets are used to provide channelized flow […]
MSE retaining wall drainage and pile obstructions
April 5th, 2022
The Reinforced Earth Co. examines the many elements of MSE retaining wall drainage when there are obstructions. Drainage inlet at roadway gutter line. Photograph courtesy of the Reinforced Earth Co. Two common types of obstructions we see behind a retaining wall face are site drainage structures and bridge abutment piles. The presence of—and loading from—these obstructions within […]
Geosynthetics for stabilization in solar farm development
February 1st, 2022
FIGURE 1 Laying down geotextiles at Chicot Solar Energy Center, Chicot County, Ark. With renewed focus on clean electricity, an era with massive investment in new solar power has begun, leading to its widespread development. Although these systems have become more cost-effective, there are often solutions left on the table that could make the costs […]
Geosynthetic capping sealing system rehabilitates the Croatian Osojnica landfill
December 16th, 2021
The landfill will become a green hill that blends perfectly into the landscape of the idyllic coastal region. Installation of the geosynthetic capping sealing system inside the gabion wall. Photograph courtesy of Naue GmbH & Co. KG The Croatian municipality of Matulji is an idyllic seaside resort on Kvarner Bay in northwestern Croatia, 8 miles […]
NAUE geosynthetics secure German road embankment over old mining area
November 2nd, 2021
Photograph courtesy of NAUE The German federal highway B91 between the cities of Deuben and Werschen in Germany is a collector road with access to the A9 motorway. The subsoil risks resulting from past lignite mining activities represent an enormous challenge in the region. Subsidence has occurred regularly. Solution In the area of a bridge […]
Hawaii geosynthetic highway drainage application
October 26th, 2021
Photograph courtesy of Tiltex Tiltex 7B geosynthetic cementitious composite mat (GCCM) was recently specified by the Hawaiian Department of Transport for a highway roadside drainage upgrade project. Due to its ease of application to existing road infrastructure and hot asphaltic road surfacing to Tiltex 7B, fast application time and 11,603-psi (80-MPa) compressive strength, Tiltex 7B […]
Geosynthetic load transfer platform for stormwater management system in Malaysia
September 6th, 2021
Installation of Mirafi HP380a over the flat thin soil layer followed by aggregate backfilling. Photograph courtesy of TenCate Geosynthetics Asia Sdn. Bhd. Climate change and human mismanagement of water resources, such as river channels and floodplains, increase flooding and erosion problems. Poor urbanization restricts floodwater flow and eventually leads to destructive flooding. Detention and retention […]