Archives

Underwater wick drain installation

October 1st, 2022

Q: We have an underwater wick drain application in the Delaware River adjacent to the Delaware Memorial Bridge. S. T. Hudson Engineers Inc. is working with the Delaware River & Bay Authority (DRBA) on a ship collision protection system (SCPS) at the piers in the river. There is up to 50 feet (15 m) of […]

Read More