FIGURE 1 Sand ballast placement operation Around 1859 the town of Hugo, Colo., was developed as a cattle ranching community to supply miners with provisions and to serve as a local stagecoach stop. It was officially founded in 1870 and incorporated in 1909; this frontier community of 786 people is located off I-70 east of […]
Hugo, Colo., wastewater treatment system improvements
Project includes geomembrane installations for three lagoons.
Features | June 1, 2023 | By: Brendan Simbeck and Duff Simbeck
You might also like...
Geocell technology in erosion control
The use of bituminous geomembranes (BGM) in reservoir applications
Geosynthetics embankment with seismic resilience for highway
Geosynthetics companies navigate the infrastructure law
Trout Unlimited rehabs Wisconsin river
Improving the performance of geosynthetic reinforced SRW by design