‘Subtitle C’ mixed waste embankment cover system
August 1st, 2015
Introduction This case history focuses on the construction of a crucial thin rock layer over geosynthetics and the solution encountered during the first construction phase of an RCRA Subtitle C embankment cover system at a hazardous and radioactive disposal site. The top and 5:1 sideslopes of the cover system were constructed with a cap consisting […]