Click
to expand or
to collapse a section.
Federal agencies have resisted experimentation with geotextiles in critical applications and there have been minimal criteria governing use in federally funded water resource projects.
The geotechnical aspects of final cover system slope stability follow the same principles used for other geotechnical stability problems.
Proper construction of an MSE wall or slope requires the owner to rely on skilled professionals performing their responsibilities correctly.
The article by Dov Leshchinskey in the April/May 2008 issue of Geosynthetics raises a number of interesting points on the impact of water, which all designers should consider in their wall designs.
A multi-billion-dollar petrochemical complex is under development in Mesaieed, an industrial city about 25 miles south of the Qatar capital, Doha, according to Qatar publications.
U.S. demand to grow 5% annually through 2010.
The U.S. Cellular Field, home of Major League Baseball’s Chicago White Sox on the south side of Chicago, features an environmentally friendly parking lot.
California-based Sure Safe EFS has announced that its engineered foundation system has proven effective in eliminating defects caused by improper settling of factory-built modular homes on faulty foundations.
Geosynthetics may not be obviously apparent in venues for the 2008 Beijing Olympic Games, but a re-examination of the many new locales built for this enormous event should offer plenty of possibilities.
A geotextile-wrapped layer of stone fill is an important element in a $3.5 million drainage project in the Thunder Bay neighborhood of Fort Erie, Ontario.
The TriAx geogrid from Tensar International won a gold medal at the Brno International Building Fair in the Czech Republic and also at Autostrada 2008 in Kiecle, Poland.
Ronald C. Keating has been elected president and chief executive officer (CEO).
Dow Building Solutions (DBS), a business unit of The Dow Chemical Company (NYSE: DOW), has acquired Stevens Roofing and Geomembrane Systems, a business of JPS Industries Inc.
Tim Bauters has joined Golder Associates Inc. as a senior project engineer at the company’s Mountain View, Calif. office.
GSE Lining Technology Inc. (GSE) has added 4 new regional managers to its North American sales team.
Pat Holubetz has joined Profile Products LLC as Midwest regional sales manager.
Gainesville, Ga.-based geotextiles manufacturer Lumite Inc., a 50% subsidiary of Thrace Plastics Group, has acquired a geotextiles manufacturing plant from Chattanooga, Tenn.-based Propex Inc.
An installation demonstration of temporary rolled erosion control product (RECP) was presented at the annual Highway Superintendents School.
Federal agencies have resisted experimentation with geotextiles in critical applications and there have been minimal criteria governing use in federally funded water resource projects.
California-based Sure Safe EFS has announced that its engineered foundation system has proven effective in eliminating defects caused by improper settling of factory-built modular homes on faulty foundations.
Proper construction of an MSE wall or slope requires the owner to rely on skilled professionals performing their responsibilities correctly.
The TriAx geogrid from Tensar International won a gold medal at the Brno International Building Fair in the Czech Republic and also at Autostrada 2008 in Kiecle, Poland.
A geotextile-wrapped layer of stone fill is an important element in a $3.5 million drainage project in the Thunder Bay neighborhood of Fort Erie, Ontario.
Proper construction of an MSE wall or slope requires the owner to rely on skilled professionals performing their responsibilities correctly.
Let’s get the word out!
The geotechnical aspects of final cover system slope stability follow the same principles used for other geotechnical stability problems.
Federal agencies have resisted experimentation with geotextiles in critical applications and there have been minimal criteria governing use in federally funded water resource projects.
The geotechnical aspects of final cover system slope stability follow the same principles used for other geotechnical stability problems.
As of May 1, 2008, there have been 500 “geosynthetics relevant” questions asked and answered by personnel of the GSI (mainly by Bob Koerner but also by George Koerner and Grace Hsuan).
The geotechnical aspects of final cover system slope stability follow the same principles used for other geotechnical stability problems.