Testing HDPE geomembrane liners

Share This Article

  • Del.icio.us
  • Digg
  • Facebook
  • Google Bookmark
  • StumbleUpon
  • Technorati
  • Twitter

Tags

Subject: Testing We prepared specifications for [a landfill] liner section that included parameters for nondestructive testing of the primary (80-mil) and secondary (60-mil) HDPE geomembrane liner. At this time, there is a need to install a 30-mil liner along the sideslope.

It is my understanding that GRI does not provide any recommendation with regards to pressurized air-channel testing for 30-mil HDPE liners. Would you be able to provide me with any comments on testing the 30-mil HDPE liner to a pressure between 22-27psi with a maximum pressure drop of 4psi over 3 minutes? Any insight would be greatly appreciated.
(Joe, New Jersey)

Reply: The reason we don’t have info on 30-mil is because it is so hard to fusion weld. In a sense we are trying to encourage the use of 40-mil or higher. If your field people feel confident in welding 30-mil, just go proportionately down from the other thicknesses. That said, watch for burnouts and severe crimping in the weld area.

Good luck!

Robert M. Koerner, Ph.D., P.E., NAE; E-mail: Robert.Koerner@coe.drexel.edu.

Comments

There are not yet any comments.
You can submit a comment using the form below.


Submit a Comment

Required. Will appear next to your comment.
Required. Will not be displayed on site or used to send unsolicited messages.
If applicable. A link to your site will appear with your comment.
Optional. Will appear in bold type above your comment.