Additional comment on Part 1 of SRW series

Share This Article

  • Del.icio.us
  • Digg
  • Facebook
  • Google Bookmark
  • StumbleUpon
  • Technorati
  • Twitter

I just finished reading the article (“Challenges in building SRWs … “) published in Geosynthetics magazine. I think your conclusion that the owner should take control of the design is right on the money and should be part of the bid package. I also believe that a generic, performance-based design can be put forth as a design that does not specify the facing or geogrid.

Such a design was done for the Babylon Landfill project in Babylon, N.Y. The design was done by GeoSyntec Consultants and leveled the playing field for all SRW suppliers.

I look forward to reading the rest of your articles.

Giulio Burra, Northeast Mesa, Carmel, N.Y.

Comments

There are not yet any comments.
You can submit a comment using the form below.


Submit a Comment

Required. Will appear next to your comment.
Required. Will not be displayed on site or used to send unsolicited messages.
If applicable. A link to your site will appear with your comment.
Optional. Will appear in bold type above your comment.