Additional comment on Part 1 of SRW series

Share This Article

  • Del.icio.us
  • Digg
  • Facebook
  • Google Bookmark
  • StumbleUpon
  • Technorati
  • Twitter

I just finished reading the article (“Challenges in building SRWs … “) published in Geosynthetics magazine. I think your conclusion that the owner should take control of the design is right on the money and should be part of the bid package. I also believe that a generic, performance-based design can be put forth as a design that does not specify the facing or geogrid.

Such a design was done for the Babylon Landfill project in Babylon, N.Y. The design was done by GeoSyntec Consultants and leveled the playing field for all SRW suppliers.

I look forward to reading the rest of your articles.

Giulio Burra, Northeast Mesa, Carmel, N.Y.