Geogrid lateral load

Share This Article

  • Del.icio.us
  • Digg
  • Facebook
  • Google Bookmark
  • StumbleUpon
  • Technorati
  • Twitter

Tags

RE: Geogrid lateral load
I have proposed a GRS wall to replace a cut fill failure. Our geotechnical division says it will not hold the lateral load of the surcharge of a car or truck. It will be 6 feet deep, 8 feet wide, and 90 feet long. We will excavate to bedrock and provide drainage. It will basically be a benched trench to edge of pavement leaving the shoulder and slope intact. What do you think?

(Carl)

Reply: The question of sustaining surcharge loads from cars and trucks is modest in light of countless GRS (aka, mechanically stabilized earth walls) supporting railroads, bridge abutments, buildings, etc.

The typical design codes all include a routine for surcharge and many do so for static and dynamic loads as well. This is well within the state-of-the-practice at this point in time and can be implemented with confidence.

Furthermore, using the dimensions stated results in a 6/8, (or 75%), reinforcement length to height ratio which is reasonable for a GRS wall.

Bob Koerner | GMA Techline

Comments

There are not yet any comments.
You can submit a comment using the form below.


Submit a Comment

Required. Will appear next to your comment.
Required. Will not be displayed on site or used to send unsolicited messages.
If applicable. A link to your site will appear with your comment.
Optional. Will appear in bold type above your comment.